We changed the design of the entrance and gave the customers a walkway to a new entrance with two posts. also we installed a water pump which works automatically every time it rains . Attached are some pictures to share.
the job started Mid of October,the weather was not cooperating, lots of rain, sometimes snow , we couldn't finish the grass , the ground started to freeze.